20MW Remote Power Station
Details
Client
20MW Generation, Stage 1
Project Type
Horizon Power
Location
Carnarvon WA, Australia
20MW
Remote Power Station (Gas and Diesel)
5.5km Interconnect
Includes dual 22kV HV Underground Feeder Cables
EPC Stage 1
Site Layout Completion
Total
Project and Construction Management
Details
20MW
Remote Power Station (Gas and Diesel)
5.5km Interconnect
Includes dual 22kV HV Underground Feeder Cables
EPC Stage 1
Site Layout Completion
Total
Project and Construction Management
Project highlights
- Mission critical COD deadline, 7 days per week remote site operations.
- Included 5.5km 22kV dual feeder cables reticulated through a town, with no damage or interruption to existing gas or water services.
- Includes full safety, regulatory and heritage compliance management.
- Includes full international procurement.
- Genco Energy managed up to 50 site personnel.
- Required navigating multiple existing town gas/power/fibre services, without damage.
- Project on budget, to schedule.